Last Editor:
Anonymous (not verified)
Approved by:
Drew Hemmingson
Job Info
Ordered Date and Time:
18/09/2016 - 20:00
Ordered by:
- Jacek
Master:
Robin Pascall
Vessel:
METEORA
To:
Unit:
- Pilot
Notes:
Jacek called for 2000 draft survey, about a 1 hour standby and then a subsequent draft survey for the final tonnage of load for the vessel. At 2140, Jacek permitted launch to return to Tymac due to slow down of loading because of rain.Will call for launch when loading completed and final draft required.
Total Job Time:
115
Standby Time:
100
| Signee | Title/Rank | Image |
|---|---|---|
Jacek | Surveyor |
Item codes
Vessel Checklist
Day Shift checklist
Night Shift checklist
Pending:
- Scheduled
Synchronized:
Yes
Device Name:
Tymac iPad 1

